A new building is under construction along the ride path of Kilimanjaro Safaris.
The small structure is located on the left-hand side of the ride path, near to the end of the safaris.
It remains unclear what the building will be used for. Speculation points to a possible reintroduction of more storyline to the ride, while not reverting to the previous poacher story.
A recently filed permit called the project "General Construction" and has an expiration date of July 2 2021.
Get Walt Disney World News Delivered to Your Inbox