The Disney Wish hit the water for the first time on February 11 2022 when it floated out of an enclosed building dock at the Meyer Werft shipyard in Papenburg, Germany.
Marking the world's first look at the newest Disney Cruise Line ship, the major construction milestone was celebrated in true Disney style with fireworks, musical fanfare and a special appearance by Captain Minnie Mouse.
It took about five hours and 29 million gallons of water from the River Ems to flood the building dock, followed by a very tight exit as the ship sailed out with only 3 feet of clearance on either side.
The ship will remain alongside the pier for several weeks before its next important milestone, when it will be conveyed stern-first down the River Ems to the port of Eemshaven, Netherlands. Interior will work will continue as the finishing touches are completed.
The ship will sail its maiden voyage on July 14 2022 from Port Canaveral, Florida.
The Disney Wish is the first of three new Disney Cruise Line ships to be built at the Meyer Werft shipyard through 2025. Each will be powered by liquefied natural gas and weigh approximately 144,000 gross tons.
Get Walt Disney World News Delivered to Your Inbox